Reliability and Safety

Reliability

Designed to Fail Safe

SmartCharge is built so the charging limits you set keep holding, even when the network, the cloud, or a charger misbehaves.

Limits That Hold at the Charger

Site protection should not depend on a connection to the cloud. SmartCharge keeps the safety envelope on the chargers themselves.

+

A safe default on every charger

Each managed charger holds a default share sized so the site stays within its limits even if every stall draws at once.

+

Extra power expires on its own

Power above the safe share is a short lease. If the cloud or the network goes away, the charger falls back to its safe share by itself.

+

Grid events held locally

Firm demand-response events for the next 24 hours are written into the chargers' own profiles, so they hold through an outage.

+

Reboots handled

After a charger restarts, its safe profiles are reinstalled and checked against what the charger reports it is enforcing.

Every Decision Checked

Load management is a control system with physical consequences, so every step is checked.

An independent verifier

Every plan is checked per node and per phase at every step, including the case where every idle stall starts at once. If it fails, nothing is sent.

Actual draw against the plan

Metered power is compared with each allocation. A charger that keeps drawing more is flagged, planned around, and raises an alert.

Offline means reserved

An offline charger keeps its committed power reserved, and one never seen keeping its profiles across a reboot is counted at its full rating.

No silent failures

Reductions are sent before increases, and a command for an offline charger, or one that has expired, is refused with a reason instead of dropped.

A record of every decision

Each allocation is kept for 30 days with its trigger, the verifier result, and every charger's answer.

Secure charger connections

OCPP security profiles 1 to 3: password authentication, TLS, and client certificates.

90%
Allocations stay within 90 percent of every limit you set
6 A
AC is never set below 6 A; the stall pauses instead
23 of 23
End-to-end scenarios passed in simulator testing
30 days
Every allocation decision kept on record

How We Test It

Before load management reaches a real depot, it has to pass on a simulated one.

+

Real protocols, simulated chargers

A charger simulator runs OCPP 1.6 and 2.0.1 stations, AC and DC, in a mixed depot.

+

Faults on purpose

Chargers that reject or ignore profiles, lose them on reboot, drift in time, answer slowly, drop the connection, or lose power.

+

An oracle that watches the limits

Every run is checked for five kinds of limit violation, including after every lease has expired.

+

Behavior that does not drift

A frozen set of cases proves load management behaves the same when cost optimization is turned off.

Built for teams

Organizations with roles for owners, admins, managers, fleet admins, depot managers, dispatchers, finance (read only) and drivers. Depot groups roll up reports by region or district. Accounts are protected by a strong password policy, email-confirmed changes, and a device list you can sign out remotely.

Safety first, then savings.

See how SmartCharge keeps your site inside its limits.

Book a demo